chevron icon Twitter logo Facebook logo LinkedIn logo YouTube logo download icon link icon audio icon quote icon posted icon clock icon author icon arrow icon arrow icon plus icon Search icon location icon location icon document icon menu icon plus-alt
Downloads:
Download

This case study report covers the ICRC Humanitarian Impact Bond (HIB) for Physical Rehabilitation, which funded the building of three new Physical Rehabilitation Programme (PRP) centres in Mali, Nigeria, and Democratic Republic of Congo (DRC). As part of the HIB, ICRC also piloted efficiency measures and built a Digital Centre Management System (DCMS), which was rolled out in the HIB centres as well as non-HIB ICRC PRP test centres.